Gold Member Since 2016
Audited Supplier
Yuyao Dihan Plastic & Hardware Products Factory

Mould, Plastic Mould, Injection Mould manufacturer / supplier in China, offering Plastic Mould for Engineer Part, CNC Machining Parts by Customer′s Drawing, Plastic Mould for Wire Drill and so on.

(/ )

Supplier Homepage Product Mould for auto parts Plastic Mould for Engineer Part

Plastic Mould for Engineer Part

FOB Price: US $1,500-8,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $1,500-8,000/ Piece
Get Latest Price
Port: Ningbo, China
Production Capacity: 800sets/Year
Payment Terms: L/C, T/T, D/P, Western Union, Paypal

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: DH-300
  • Surface Finish Process: Polishing
  • Plastic Material: PA66+GF
  • Application: Car, Household Appliances, Commodity
  • Design Software: Pro-E
  • Certification: ISO, SGS
  • Customized: Customized
  • Software Used for Design: Ug,PRO E,CAD,Solidworks
  • Transport Package: Wooden Packing
  • Origin: China
  • Shaping Mode: Injection Mould
  • Mould Cavity: Single Cavity
  • Process Combination Type: Single-Process Mode
  • Runner: Hot Runner
  • Installation: Fixed
  • Standard: HASCO
  • Material for Core and Cavity: 2344/2738/718h/2316/H13/Nak80/S136
  • Trademark: OEM brand
  • Specification: based on customer′s standard
  • HS Code: 8480710090
Product Description
Factory Advantage:

Customized design
Professional Mold Team
Delivery on time
Strictly quality control
Low price
Good Service

 
Design softwareUG,Pro E,CAD,Solidworks
Manufacture standardDME,HASCO,LKM or based on customer's standard
Steel material for core and cavity2344/2738/718H/2316/H13/NAK80/S136
Mould Life500000-1000000 shots

Plastic Material Used 

ABS/PP/PA6/PA66/PC/POM/PVC/PBT/PMMA/TPE/HDPE 
Drawing Design Time Within 4 days 

Runner 

Cold runner or Hotrunner 
Manufacture  time20 --60 days
Business TypeOEM or ODM
Mould AccessoryDEM/HASCO Standard
Mould orders process1. Received purcahsed order

2. Part 2D or 3D drawing submittion from customer; Or Part sample recevied from customer

3.Mould flow analysis and  Arrange to make 2D  and 3D mould Drawing

4. Drawing confirmed by customer

5. Purchasing material ; then steel parts machining

6. Arrange the first testing time

7. Sample quality checking and arrange the mould adjustment

8.  Sample quality confirmed

9. Mould shippment;

 

Plastic Mould for Engineer PartPlastic Mould for Engineer Part
Plastic Mould for Engineer PartPlastic Mould for Engineer PartPlastic Mould for Engineer Part
Send your message to this supplier
Avatar
Mr. Jacky
Sales Manager
*From:
To: Mr. Jacky
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category